Approved Group International
Camera and white AGI safety helmet on a site table in front of a fire-damaged plant

Knowledge Centre

Blog

Articles, case studies and technical notes, written by the engineers who attended the loss.

Latest

Satellite view of monsoon cloud systems over Southeast Asia and Australia

ArticleDisaster Restoration

Industrial Flood Restoration Malaysia

Industrial flood restoration in Malaysia, Singapore and Indonesia. IICRC protocols, real cases, and what to do in the first 72 hours after a flood.

By AGI Team8 min read
Read the article

The library

Everything we have published

Filter by type and service, or search for the piece you were sent.

Webinars
Type
Service

108 pieces · page 8 of 9

  • Figure 1: Autoclave Drawing.

    Case StudyForensic Investigation

    Autoclave Fire Investigation

    A failure and fire was reported to have occurred in an autoclave, which is used to bond the plastic interlayer to the glass to produce laminated glass.

    By AGI Team3 min read
    Read the case study
  • Figure 1: Soil sample consist of various sizes of particles which can be physically separated

    ArticleForensic Investigation

    Soil Sleuth

    Referring to a real case that we handled back in the year 2008, soil evidence played an important role in solving this case. The case was about a vehicle…

    By AGI Team4 min read
    Read the article
  • Figure 1: Classification and grouping of explosives.

    ArticleForensic Investigation

    Explosions (Dust Explosion)

    Explosives are materials that produce violent chemical or nuclear reactions. Explosive material is a reactive substance that contains a great amount of…

    By AGI Team3 min read
    Read the article
  • The above picture shows initial stroke of signature A on exhibit E2 showing steep straight upstroke.

    Technical NoteForensic Investigation

    Signature Authorship Determination

    The forensic team of Approved Forensics Sdn Bhd (AFSB) was approached to determine the authorship of signatures on agreement documents.

    By AGI Team1 min read
    Read the technical note
  • Figure 1: Transmission of Transient Voltage through the Start-Finish Data Cable

    Case StudyForensic Investigation

    Lightning Investigation

    A Reverse Angle Photo Finish Camera (RAPFC), located at the finishing post of a horse racing track, was reported to have failed. The incident was discovered by…

    By AGI Team2 min read
    Read the case study
  • Figure 1: General view of the extent of fire damage onto the roof of the Restaurant B (red arrow) and the newly erected cement wall on top of the pre-existing low-level wall after the fire (blue arrow).

    Case StudyForensic Investigation

    Fire Investigation to Restaurant

    Approved Forensics Sdn Bhd (AFSB)’s Team received an assignment to investigate the origin of a fire involving 2 adjoining restaurants. Besides the cause fire…

    By AGI Team2 min read
    Read the case study
  • Agi fire and explosion investigation stage bus fire investigation figure

    Case StudyForensic Investigation

    Stage Bus Fire Investigation

    A stage bus caught fire during its operations when the driver stopped by the roadside to alight the passengers.

    By AGI Team1 min read
    Read the case study
  • Agi damage assessment of 1 lift and 6 escalators view of affected escalator photograph

    ArticleDamage Assessment

    Damage Assessment of 1 lift and 6 escalators

    At approximately 1530 hours on Monday, 6 March 2017, an outflow of water from at level 7M2 was reported within SC Shopping Centre (hereinafter referred to as…

    By AGI Team1 min read
    Read the article
  • Agi fire or no fire picture

    ArticleForensic Investigation

    Fire or No Fire?

    On 15 December 2016, Thursday, at about 1400 hours, there was an incident involving a transformer/ switchgear located in the premises of a golf resort in Johor.

    By AGI Team1 min read
    Read the article
  • Agi gas turbine explosion investigation photograph

    Case StudyForensic Investigation

    Gas Turbine Explosion Investigation

    At approximately 1300 hours on Saturday, 14 December 2013, a loud bang resembling an explosion was heard at the exhaust ducting of Gas Turbine Generator (GT) 1…

    By AGI Team1 min read
    Read the case study

Talk to the team

Every piece here was written by people you can instruct

Tell us what happened and we will put the right discipline on it, usually the same day.