Approved Group International
Agi gas turbine explosion investigation photograph
All insights

Gas Turbine Explosion Investigation

At approximately 1300 hours on Saturday, 14 December 2013, a loud bang resembling an explosion was heard at the exhaust ducting of Gas Turbine Generator (GT) 1…

1 min read

At approximately 1300 hours on Saturday, 14 December 2013, a loud bang resembling an explosion was heard at the exhaust ducting of Gas Turbine Generator (GT) 1 after eleven (11) attempts of ignition during the maintenance period. Further external inspection conducted on GT-1 revealed that a number of bypass ducting bellows had ruptured and deformation was observed at the economiser casing. This report presents the findings and results of the investigation and examination of the origin and possible cause of the explosion. The investigation was conducted through site visits, data-gathering and forensic study. During the visits, the investigation team conducted a thorough on-site investigation and examination of the scene. During the course of the investigation and examination, the Team performed damage analysis and scientific interpretation of the scene to determine the possible area of origin, and potential cause of explosion.

Agi gas turbine explosion investigation photograph

Based on the Team’s overall inspection and damage analysis of GT-1 and the surrounding area, the flame front from the fire which had initiated within the combustion chamber during the gas ignition sequence had propagated through the interconnected bypass ducting which contained accumulated natural gas. An explosion ensued as the flames acted as the ignition source to the pre-mixed fuel air cloud (fuel load) within the bypass ducting when the concentration ratio of natural gas and oxygen reached the lower explosive limit.

Agi gas turbine explosion investigation photograph

Based on the evidence, damage analysis and from the process of elimination of all other possible causes, the Team found that the explosion had commenced as the result of defective gas control valves and insufficient purging time.

Agi gas turbine explosion investigation photograph

The Team recommend that the main and pilot control valves be replaced. It is also essential to increase the purging time from 40 seconds to the recommended 350 seconds.

Keep reading

Related insights

All insights
  • Agi fire or no fire picture

    ArticleForensic Investigation

    Fire or No Fire?

    On 15 December 2016, Thursday, at about 1400 hours, there was an incident involving a transformer/ switchgear located in the premises of a golf resort in Johor.

    By AGI Team1 min read
    Read the article
  • Agi failure investigation of a mitsubishi engine image

    Case StudyForensic Investigation

    Failure Investigation Of A Mitsubishi Engine

    A Mitsubishi generator was reported to have failed within the premises of power generation station at South Ternate, North Maluku, Indonesia.

    By AGI Team2 min read
    Read the case study
  • Fire investigation at a timberplant figure

    Case StudyForensic Investigation

    Fire Investigation At A Timberplant

    In a morning, a fire was reported to have occurred at one (1) of the production and storage building in the premises of a timber plant in Jakarta, Indonesia.

    By AGI Team2 min read
    Read the case study

24/7 response

Does this affect a claim you are handling?

Send us the detail and we will tell you what a proper investigation would need to establish.