What Fails in Construction and Infrastructure Projects
Water reaches more of what is lost on a site than fire does. Waterproofing is often incomplete. Floor slabs sit exposed. Risers are open to weather before the envelope closes. Stored materials, installed plant and trade work can all be affected before anyone finds the source. Lightning follows a similar path. It reaches site offices, fitted lift installations and the control systems on mobile plant, through power more exposed than a completed building's protection system.
Lifting incidents form their own recurring category. A tower crane failure can originate in the slewing ring, the jib, the counterjib, or the hoisting motor and its drive. Overturning by a mobile or crawler crane raises a separate question, about ground bearing capacity and rigging. Structural collapse during construction is rare. It is disproportionately serious when it occurs. Formwork or falsework failure before concrete has gained strength is one of its more consistent causes. Damage to plant on site, from fire, flood or impact, is a further recurring cluster, separate from the structure itself. Storm and high wind add a smaller but recurring share, particularly to hoardings and signage not yet fixed to their permanent supports.