Compressor Failed. WHY?
A Second Stage Compressor (SSC) failed at an air collection company. Prior to the incident, a power failure occurred on the same day at 1700 hours which caused the Main Air Compressor (MAC), which houses the SSC, to trip.
A Second Stage Compressor (SSC) failed at an air collection company. Prior to the incident, a power failure occurred on the same day at 1700 hours which caused the Main Air Compressor (MAC), which houses the SSC, to trip.
Despite being one of the most common and useful materials manufactured materials in the world, steel has always had one major flaw. It rusts.
An air handling unit (hereinafter referred to as AHU) room is normally equipped with a gaseous fire suppression system which utilised INERGEN, which is a mixture of nitrogen, argon and carbon dioxide gases, stored gas cylinders.
The operator of a Tower Crane was using it to lift up an object from the floor ground to the operator’s cabin. He noticed that the boom had deformed at the first and second sections when he exited from the cabin to retrieve the object.
A failure and fire was reported to have occurred in an autoclave, which is used to bond the plastic interlayer to the glass to produce laminated glass.
A Reverse Angle Photo Finish Camera (RAPFC), located at the finishing post of a horse racing track, was reported to have failed. The incident was discovered by the operator when he noticed that the computer at the Stipes and Judge room failed to establish a connection to the RAPFC at the Finishing Post.
At approximately 1530 hours on Monday, 6 March 2017, an outflow of water from at level 7M2 was reported within SC Shopping Centre (hereinafter referred to as SC), located at, Cheras, Kuala Lumpur, Malaysia.
A Mitsubishi generator was reported to have failed within the premises of power generation station at South Ternate, North Maluku, Indonesia. The incident was discovered when the alarm system of the generator activated.
In a morning, a fire was reported to have occurred at one (1) of the production and storage building in the premises of a timber plant in Jakarta, Indonesia. The incident was discovered by one (1) of the maintenance staff who saw smoke emanating from within the building via the ventilation holes on the wall.
In an afternoon, three (3) alternators for the 3 generators were reported to have failed simultaneously, allegedly due to lightning activity. The reportedly damaged components included the main rotor coil, exciter rotor coil, Automatic Voltage Regulator (AVR), diodes, and bearings.